Mirror commissioning
The 2 W test point, full uncertainty budget, controls, exclusions and open design-freeze requirements.
Current research package
Read the first experiment, inspect the supporting science, and reproduce the calculations. This is the current review package for Metric Flight.
COMPLETE REVIEW BUNDLE / EDITION 09
Current commissioning protocol, apparatus requirements, budget, scientific report, model code and the audit record—in one indexed download.
ZIP · 0.58 MB · includes START-HERE.txt and SHA-256 hashes
READ IN THIS ORDER
The 2 W test point, full uncertainty budget, controls, exclusions and open design-freeze requirements.
The preliminary architecture and itemized planning allowances. Final interfaces and supplier quotations remain open.
The v0.2 report covers Alpha 1 constraints and graphene force estimates. Its illustrative examples are distinct from the current mirror test.
Source checks, numerical corrections and the reasons for the current commissioning decision.
DIRECT DOWNLOADS
REVIEW QUESTIONS
Does the measurement model close the optical momentum budget? Is the calibration independent? Which state-correlated artifact is insufficiently bounded? Can the proposed covariance and sampling assumptions be justified by commissioning data?
Scientific leadership, external review and registration remain outstanding. A downloadable file is a reviewable draft; it is not evidence of certification or a completed experiment.