Current research package

One starting point.
Every assumption inspectable.

Read the first experiment, inspect the supporting science, and reproduce the calculations. This is the current review package for Metric Flight.

COMPLETE REVIEW BUNDLE / EDITION 09

Start here.

Current commissioning protocol, apparatus requirements, budget, scientific report, model code and the audit record—in one indexed download.

ZIP · 0.58 MB · includes START-HERE.txt and SHA-256 hashes

Current experiment
2 W mirror commissioning · Draft 08
Supporting scientific analysis
Alpha 1 / graphene model · v0.2
Evidence status
Design and calculations · no company data

READ IN THIS ORDER

The current experiment comes first.

01 / CURRENT SPECIFICATION

Mirror commissioning

The 2 W test point, full uncertainty budget, controls, exclusions and open design-freeze requirements.

Read the protocol ↗
02 / BUILD REQUIREMENTS

Apparatus and procurement

The preliminary architecture and itemized planning allowances. Final interfaces and supplier quotations remain open.

Inspect the build plan ↗
03 / SUPPORTING ANALYSIS

Scientific report and model

The v0.2 report covers Alpha 1 constraints and graphene force estimates. Its illustrative examples are distinct from the current mirror test.

Open the PDF ↗
04 / REVIEW RECORD

What the audit changed

Source checks, numerical corrections and the reasons for the current commissioning decision.

Read the decision ↗

DIRECT DOWNLOADS

Take the files you need.

REVIEW QUESTIONS

Help us find the decisive weakness.

Does the measurement model close the optical momentum budget? Is the calibration independent? Which state-correlated artifact is insufficiently bounded? Can the proposed covariance and sampling assumptions be justified by commissioning data?

Scientific leadership, external review and registration remain outstanding. A downloadable file is a reviewable draft; it is not evidence of certification or a completed experiment.